Municipal Utility MIDWEST USFebruary 20, 20210 A substation design that would have normally taken seven weeks was completed in seven days! Share this post Related Posts Connect with Us at Utility Week Live 2023 SBS Sponsors 2023 Substation Design Solution Industry Consortium Updates to SDS Protection and Control and SDS Physical Products Comments are closed.